Build a construction job hazard analysis step by step: break the job down, find the hazards in each step and set specific controls. Complete it online and download a crew-ready PDF or Word file.
By CircleInspect Safety Experts · Updated: 2026-10-16
What the Construction JHA Builder covers
Section 1: Job Setup
Is the job, location, crew and date of the JHA recorded?
Is the task broken into individual steps in the order they are done?
Has the crew that will do the work helped write the JHA?
Are permits needed for the job identified (hot work, excavation, confined space, lifting)?
Are tools, plant and materials for the job listed?
Section 2: Hazards per Step
Are hazards identified for every task step?
Are struck-by and caught-between hazards considered for each step?
Are fall hazards considered for any work above 6 ft (1.8 m)?
Are electrical, underground and overhead utility hazards checked?
Are silica dust, noise and other health hazards considered?
Section 3: Controls per Hazard
Does each hazard have a specific control, not just 'be careful'?
Are controls chosen using the hierarchy (eliminate, engineer, administrate, PPE)?
Is the PPE for each step listed?
Is a competent person named for excavation, scaffolding or fall protection where required?
Are exclusion zones and spotters set for mobile plant?
Section 4: Briefing & Review
Has the crew been briefed on the JHA before starting and signed it?
Is the JHA available at the work location?
Is the JHA reviewed when conditions, crew or methods change?
Are stop-work conditions explained?
Is the supervisor's sign-off recorded?
What is a Construction JHA Builder?
A construction job hazard analysis (JHA), also called a job safety analysis (JSA), breaks a task into steps, lists the hazards in each step and sets a control for each hazard. OSHA recommends JHAs for high-hazard jobs, and many contractors require one before work starts each day.
Why Use This Checklist?
Focuses on the hazards of each step, not the whole site
Gets the crew involved in planning their own safety
Flags permits and competent-person requirements
Gives a signed pre-task briefing record
How to Use This Construction JHA Builder
Open the Checklist
Access the free construction jha builder above — no login or installation required.
Complete Each Section
List the job steps in order with the crew, then write the hazards and a specific control for each step.
Add Observations
Brief the crew at the work location and have everyone sign before starting.
Download & File
Export your completed checklist as a PDF or Word document and retain it for your records.
Frequently Asked Questions
What is the difference between a JHA and a SWMS?
A JHA breaks a job into steps, hazards and controls. A SWMS (Safe Work Method Statement), used mainly in Australia, documents high-risk construction work and how it will be done safely, often with more detail on methods and legal requirements.
When should a construction JHA be updated?
Whenever the task, crew, equipment, weather or site conditions change, or after an incident or near miss.
Is this Construction JHA Builder free to download?
Yes, this checklist is completely free. Complete all fields directly in your browser and download a finished copy as a PDF or Word document — no account, subscription, or software installation required.